Assembly
This section is redundant to the instructional videos, if you understand all from previous materials you can skip to theDisassembly section.
The minimal assembly consist of these steps:
Unpack UAV backpack.
Unpack operator backpack.
Assemble Doodle Labs radio and the mast.
Assemble Stribog Nexus UAV.
Prepare GCS setup with controller.
The full assembly is also presented in instructional videos, please view them before continuing.
Doodle Labs Radio - Assembly
Unpack Doodle Labs and its two antennas. Screw on the antennas. In the case battery is missing please connect the Doodle Labs wearable battery and secure it with the mechanism incorporated on the battery module.

The drawing is illustrative for Nexus Stribog UAS a different antenna setup is used. The setup showed is using 2x omnidirectional antenna, but in the system 1x omnidirectional antenna and 1x directional antenna are used.
Mast - Assembly
Mast Assembly Steps
Unpack the tripod and place it on a rigid surface, or use the securing pin to ensure stability.
Mount the directional antenna to the tripod, pointing in the direction of expected flight.
Mount the Doodle Labs wearable module.
Connect the directional antenna with the Doodle Labs wearable module.
Check if the USB-C to Ethernet adapter is connected to the Ethernet cable (25m). If not, connect it.
Connect and secure the USB-C to Ethernet adapter to the Doodle Labs wearable module. Ensure USB-C is connected to the port named: ETH USB-H.
Use a screwdriver to fix the screws of the USB-C to Ethernet adapter to the Doodle Labs wearable module.
Unpack the 25m Ethernet cable to the desired position.
Steps are detailed in the instructional videos, please see them for further reference.
Nexus Stribog UAS - Assembly
After removing Stribog UAS from packaging, its body should look as follows:

Unfold the beam in direction showing in the picture below.

After folding the beam, look for the indicator of correct lock state, which can be found on the bottom side of beam locking mechanism. Correct lock state is shown in the first picture below.


Make sure, that locking indicator is in the correct state. Incorrectly locked beam may lead into unwanted behavior during flight and can cause crashing of the drone.
Repeat previous steps to unfold all beams into its correct positions.
Fully unfolded drone can be seen in the picture below:

After locking all beams in place, proceed to next step.
After unfolding all beams, you are able to unfold all propellers into their correct position. All propellers are already mounted on the Stribog UAS when shipped to you.

Unfold the propellers by rotating them until they are fully extended and aligned parallel to each other.


Repeat the process to unfold all four pairs of propellers.

After unfolding all propellers, proceed to next step.
Screw on both antennas in clockwise direction.


Please note that antennas are placed differently on the sides of the Nexus Stribog UAV.
After mounting antennas, proceed to next step.
Insert the drone's leg into the designated slot until it locks securely in place.

You will hear 'click' of the locking mechanism when the leg is correctly locked.

Repeat steps above to mount all four legs of the drone.

Now you have assembled full body of the drone. Proceed to next subsection: Mounting batteries.
The 360° camera must be mounted after the batteries due to the collision of these components.
To mount the camera follow these steps:
Ensure that the batteries are already mounted on the UAV.
Locate connector in the tail of the drone.
Connect the 360° camera to the tail connector using the opposite side of the connecter on the camera.
While connecting ensure that the camera is connected as straight as possible due to the mechanical stress of the pins used.
Remove protective gear from the payload by pulling it.
Mounting batteries
Don't forget to charge batteries before mounting them.
You can find more information about battery charging in section Batteries and Charging.
Always make sure, that you are using same type of batteries, which are equally charged!
It is recommended to charge both batteries simultaneously.
Do not charge batteries in parallel.
Take two equally charged batteries and slide them halfway into the guide rails on the top of the Nexus Stribog UAS.
Note, that safety latch is in the opposite side of sliding direction.

Pull the safety latch and push the batteries fully into the guide rails until securely seated.


Ensure, that safety latch successfully locks in place.

Now repeat the process to mount second battery.
You can also plug in the batteries into the XT60 connectors ( 1 ) located nearby latch mechanisms.
For safety reasons, it is recommended to plug in the batteries only when you are going to use the drone at the very moment.

GCS - Assembly
Open rugged laptop and turn it on.
Enter the password.
Press login and touch the hardware two-factor authentication key located at the covered USB-A ports on the right side of the rugged laptop.
The Nexus GCS will auto-start in few moments.
Connect the USB-C cable to the covered upper port of the RadioMaster controller.
Connect the same cable to a suitable USB port on the laptop.
Select the control mode on the RadioMaster controller.
Last updated